نتایج جستجو برای: Project scheduling

تعداد نتایج: 310880  

Journal: :journal of optimization in industrial engineering 2013
mostafa nikkhah nasab amir abbas najafi

projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. an integer programming model is formulated for the project portfolio selection and scheduling.two heuristic algorithms, genetic algorithm (ga) and simulated annealing (sa), are presented to solve the problem. results of cal...

Journal: :مهندسی صنایع 0
ایمان بساق زاده دانشگاه صنعتی اصفهان سید رضا حجازی دانشگاه صنعتی اصفهان امیر موسی احسان دانشگاه صنعتی شریف

the research on project scheduling has widely expanded over the last few decades. the vast majority of these research efforts focus on exact and suboptimal procedures for constructing a workable schedule, assuming complete information and a static deterministic problem environment. project activities are scheduled subject to both technological precedence constraints and resource constraints, mo...

Journal: :journal of optimization in industrial engineering 0
behrouz afshar nadjafi department of industrial engineering, islamic azad university of qazvin, qazvin, iran, shahram shadrokh department of industrial engineering, sharif university of technology, tehran, iran,

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

Journal: :international journal of industrial engineering and productional research- 0
m. ranjbar department of industrial engineering, faculty of engineering, ferdowsi university of mashhad, mashhad

project scheduling   net present value   we consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. in this problem, a project consists of a set of sequential phases such that each phase contains one or more sub-projects including activities interrelated by finish-start-type precedence relations with a time ...

Journal: :amirkabir international journal of modeling, identification, simulation & control 2015
i. bossaghzadeh s. r. hejazi z. pirmoradi

a common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. as a result, project managers are often unable to meet the deadline time of the milestones. robust project scheduling is an effective approach in case of uncertainty. upon adopting this approach, schedules are protected against po...

Journal: :journal of optimization in industrial engineering 2010
behrouz afshar nadjafi shahram shadrokh

extensive research has been devoted to resource constrained project scheduling problem. however, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. in this paper, we consider the project scheduling problem of minimizing the total cost subject to resource constraints, earliness-tardiness penalties and preemption penalties, ...

Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...

Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...

I. Bossaghzadeh S. R. Hejazi Z. Pirmoradi

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

Sama Ahmadpour Vahidreza Ghezavati

In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...